TOSE’E SANAYE PETRO MAKAN STEEL BUSINESS CORPORATION
STEEL BUSINESS CORPORATION
Production process and coating of steel pipes project
Transmission pipeline for C2+ from NGL3100 to NGL3200
The objective of this plan is to construct a C2+ transmission pipeline from NGL-3100 to NGL-3200 with a length of 180 kilometers from the Daliran refinery to Imam Petrochemical. The project began with the goal of collecting associated gases resulting from oil refining. The result of this project is not only preventing the waste of national resources, but also joint fields with Iraq, by burning associated gases and preserving the environment, but also producing natural gas and sulfur granules, ensuring economic benefits, and creating sustainable employment. This plan is a national project, and Petro Makan Industry Development Company seeks to play a significant role in national interests by producing and supplying a part of the project’s pipelines.
National project for supplying steel pipes, coating, and transportation
The second phase of the Zarrin Dasht water supply project will be supplied from the Rudbar dam
This project, as part of the “Iran A to Z” campaign, involves the transfer and purification of water from the Rudbar dam to the city of Hajjiabad and the villages along the way. More than 35,000 people living in these areas will benefit from this project. The water pipeline to the Zarrin Dasht county is approximately 40 kilometers long, with the aim of purifying and transferring 860 liters per second of water from the Rudbar dam to the cities of Darab, Jannat Shahr, Hajjiabad, and the villages along the water pipeline. One of the objectives of constructing this large dam is to control and store floodwaters, regulate the flow of the river and store water before it becomes brackish, and use it for drinking, industry, agriculture, and supply drinking water to cities in the southern province of Fars and flood-prone lands. Furthermore, with the operation of phase one of the project, 150 liters per second of water from the Darab purification facility will be supplied to Zarrin Dasht. Therefore, in phase two, with the increase in purification capacity to 360 liters per second, water from the Rudbar dam will be transferred to the Zarrin Dasht county.
The national project aims to distribute gas to provinces
The Petro Makan Industries Development Company assists in the development of the country’s gas distribution network through the supply and production of natural gas pipes. Recently, the company has participated in the supply of pipes in Semnan and Hormozgan provinces.